AFC Energy PLC

AFC Energy Plc. Proud to be a PLC company based at Dunsfold Aerodrome, home to pioneering organisations including BBC’s Motoring Show Top Gear, who use as a test track. The aerodrome was formerly a Royal Canadian Air Force airbase constructed during the WW2 and was later used by British Aerospace as a manufacturing and test facility.

Summary:

AFC Energy Plc approached OC Projects Ltd to partner with in developing their recently acquired 30,000 sq ft facility. Office space was required for an additional 40+ desk positions. The building, formerly an old aircraft hangar was in poor condition and required a complete make-over to bring it into line with AFC Energy Plc’s corporate identity.

Details:

The existing mezzanine structure was stripped back, refitted with new staircase and better shaped. Internal windows constructed to overlook the manufacturing area. Canteen, WC’s, Showers, Corridor, Offices and Meeting Rooms, Canteen / Teapoint / WC’s / Shower fitouts. External works included new waste water drainage runs. LED high bay lighting to the Main Hangar. The original aircraft weighbridge scales refurbished.

An employee commented:

“The fitout of our New Assembly and Commissioning Facility at Dunsfold by the end of March is central to this ambition. We’re doing this in a Unit where British Aerospace originally manufactured the Harrrier, thereby continuing the legacy of high-value manufacturing in this part of Surrey”

More Images

If you would like more information about this project or wish to discuss your requirements in more detail, please contact our professional team as below.

Industrial / Office Building Fitout

Location: Woking, Surrey.

Project Duration: 8 weeks

Area: Total 30,000 sq ft

If you would like more information about this project or wish to discuss your requirements in more detail, please contact our professional team as below:

   01202 710800
   sales@officeconceptsuk.com
   Send Us A Message Below

   Where We’re Based

Concept House, Broom Road, Dorset, Poole BH12 4NL

Other Similar Case Studies

Leave a Reply

Your email address will not be published. Required fields are marked *