Trident Maritime Systems
Two mezzanine floors were designed, manufactured and built, one existing mezzanine was utilised. Ground floor and first floor areas were stripped out both partial and complete to each of the units.
Read MoreTwo mezzanine floors were designed, manufactured and built, one existing mezzanine was utilised. Ground floor and first floor areas were stripped out both partial and complete to each of the units.
Read MoreA new Glazed Entrance Area for Visitors was created by making alterations to existing cladding and install curtain walling of size 5m x 6.5m with double Reception / Entrance doors.
Read More4 Individual Offices created plus 2 Main Open-Plan Office Areas on both ground floor and first floor…
Read MorePlanning applicants and grant of permissions. A mezzanine floor of 233m² was installed. Jumbo firewalls built to 9.5m high to segregate offices from manufacturing.
Read MoreOC Projects Ltd were approached about modernising and updating these areas and pleased to secure the office fitout project on negotiation basis with new client.
Read MoreIncluded removal and stripouts of Boy and Girl students washrooms complete, including a NLB wall to ‘open-up’ / enlarge the space to become more visible from the corridor.
Read MoreBreathe Safety Group specialises in services in relation to respiratory protective and confined space equipment.
Read MoreAFC Energy Plc. Proud to be a PLC company based at Dunsfold Aerodrome, home to pioneering organisations including BBC’s Motoring Show Top Gear, who use as a test track.
Read MoreOC Projects Ltd was delighted to work with new client to refurbish and fitout their existing workplace. Works included ground and first floor offices, meeting rooms, toilet facilities, ground floor Reception, toilets and entrance area. Minor builders works to suit new external entrance layout.
Read MoreOne of the fastest growing individual health insurance companies in the UK continuing to look after customer’s health since establishment in 2000.
Read More