The showroom was to be gutted and re-done completed with no space for staff to operate and continue selling vehicles, therefore temporary facilities were provided on-site to accommodate this. External works included replacing rotten timber, new aluminium windows, spray painting to others. Internal works included isolation and stripout to gas meter within Boiler Room. Raise floor heights to enlarge existing showroom footprint. New fire escape doors, larger DDA WC, new showroom ceiling, flooring, décor, HVAC, electrical, fire alarm, data.

More Images

If you would like more information about this project or wish to discuss your requirements in more detail, please contact our professional team as below.

    Car showroom / Industrial building fitout

    Location: Mere, Warminster

    Project Duration: 12 weeks

    Value: £190,000 +VAT

    If you would like more information about this project or wish to discuss your requirements in more detail, please contact our professional team as below:

       01202 710800
       sales@officeconceptsuk.com
       Send Us A Message Below

         Where We’re Based

      Concept House, Broom Road, Dorset, Poole BH12 4NL

      Other Similar Case Studies

      Leave a Reply

      Your email address will not be published. Required fields are marked *